How do I make a schedule editable in Revit?

select a cell or column in the schedule body. Click (Insert) on the Columns panel to open the Select Fields dialog, which functions like the Fields tab of the Schedule Properties dialog. Add new schedule fields and adjust the field order as needed.

How do I edit a schedule?

To edit a schedule:

  1. Click Schedules, then choose a schedule from the list.
  2. Click. …
  3. Make changes to each page that you want, and click Next.
  4. Click Finish in the Schedule assistant to save changes.
  5. If necessary, select Enabled next to the schedule so that it will run.

How do I Create a custom schedule in Revit?

Create a Key Schedule

  1. Click View tab Create panel Schedules drop-down Schedule/Quantities.
  2. In the New Schedule dialog, select the element category for which you want to schedule keys.
  3. Select Schedule keys. …
  4. Click OK.
  5. In the Schedule Properties dialog, add the predefined fields for the style. …
  6. Click OK.

What is an embedded schedule in Revit?

Use embedded schedules to display information about the components in rooms, spaces, duct systems, piping systems, or electrical circuits categories.

How do you add a parameter to a schedule in Revit?

Tip: You can modify or add a shared parameter in the Fields tab of the Schedule Properties dialog. To modify a shared parameter, select it and click Edit under Scheduled fields. To add a new parameter, click Add Parameter.

IT IS INTERESTING:  How do you remove floor lines in Revit?

How do you create a family schedule in Revit?

Add raster images or PDF files to a schedule or family.

Create a Schedule or Quantity

  1. Select a component from the category list. A default name appears in the Name text box, which you can change as necessary.
  2. Select Schedule building components. Note: Do not select Schedule keys.
  3. Specify the phase.
  4. Click OK.

How do I create a schedule in Revit 2022?

Create a Key Schedule

  1. Click View tab Create panel Schedules drop-down Schedule/Quantities.
  2. In the New Schedule dialog, select the element category for which you want to schedule keys.
  3. Select Schedule keys. …
  4. Click OK.
  5. In the Schedule Properties dialog, add the predefined fields for the style. …
  6. Click OK.

What is embedded schedule?

Embedded Schedules allow you to display both Room or Space data AND Data on Components that are living in those Rooms or Spaces.

How do I create an area schedule in Revit?

Click View tab Create panel Schedules drop-down (Schedule/Quantities).

In the New Schedule dialog, do the following:

  1. For Category, click Mass Floor. …
  2. For Name, specify the schedule name.
  3. Select Schedule building components.
  4. Click OK.

How do you unsplit a schedule in Revit?

You can rejoin the sections of a split schedule on a sheet. When you select the schedule on a sheet, a 4-way arrow control displays in the upper left corner of each section of the schedule. Use this arrow control to drag and drop a section of the schedule over another section to join them.

How do I create a totals schedule in Revit?

Click Formatting on the Properties palette. Select the Cost field, and under Field formatting, select Calculate totals. To calculate the total cost for all elements in the model, check the Sorting/Grouping tab and select Grand totals. Grand totals for columns in the schedule will be calculated.

IT IS INTERESTING:  Best answer: How can I see my house plans?